WHAT
Crews will use large equipment to remove accumulated excess sand from the Talbert Channel outlet in Huntington Beach, as allowed
through a regulatory permit.
This emergency activity is needed to remove water flow blockage. It is critical flood control maintenance to allow tidal flushing of the marsh to maintain water quality and protect habitat.
Removing built-up sand at the outlet is often performed as routine maintenance to remove blockages and minimize potential flood risks. It also maintains the natural tidal flow with the adjacent Talbert and Huntington Beach marsh area. Sand will be placed along beach area on the north side of the channel outlet.
Biological monitors will be on site to ensure wildlife is protected at all times.
Your safety is the top priority!
Large equipment will be used. Please observe all caution signs/barriers, and stay a safe distance from the work area.
WHERE
Orange route: Talbert Channel Outlet, Huntington Beach
Green route: Primary Sand Relocation Area
Blue route: Secondary Sand Relocation area if needed.
WHEN
Anticipated Construction Duration: February 2 - March 15, 2026
Working Hours: Monday - Saturday, 6 a.m. - 6 p.m.
The construction schedule is tentative and subject to change due to weather and other factors.
CONTACT INFO
contact_phone Operations & Maintenance Front Desk (714) 955-0200
language ocpublicworks.com